Saltar al contenido principal

BRD 2.6 Create SMS Campaña, stage 3 of 4, Schedule

Stage 3 is headed "Schedule Your Campaña", with the instruction "Decide when to send your campaign". It offers two choices.

ChoiceEffect
Send immediatelyThe campaign sends as soon as it is created. No further fields appear.
Schedule for laterReveals Date, Time and Timezone. All three must be set.

To schedule a campaign for later:

  1. Seleccione Schedule for later.
  2. Seleccione the Date field, labelled Pick a date, and choose a date from the calendar. The calendar opens on the current month and weeks begin on Sunday. Every date before today is disabled, so a campaign cannot be scheduled into the past. The chosen date is then displayed in full, for example August 26th, 2026.
  3. Ingrese el Time.
  4. Set the Timezone. The dropdown offers 42 zones.
  5. Seleccione Next Step to move to Review, or Volver to return to Audience.

Next Step stays greyed out until both Date and Time hold a value. Selecting a date alone is not enough.

Figure key, Create SMS Campaña, stage 3​

  1. Stage indicator with Schedule active.
  2. Heading, Schedule Your Campaña.
  3. Send immediately option.
  4. Schedule for later option.
  5. Date field, showing Pick a date before a date is chosen.
  6. Calendar, with all past dates disabled.
  7. Time field.
  8. Timezone dropdown, defaulting to (GMT-6:00) Central America.
  9. Volver and Next Step buttons.